The eight piles that support the pier were driven 20 feet below the bay floor, six of them into bed rock that required extensive drilling when project was launched Dec. 3.
Here is the original:
English Camp's new dinghy dock features 115-foot long pier …
Filed Under Dinghy News
Tags: bed-rock, below-the-bay, eight-piles, extensive-drilling, feet-below, pier, support-the-pier, the-bay, the-pier, were-driven